April 10 2024 0Comment

Circular Plastic

The Circular Plastic plant realised by the Iren Group in Borgaro Torinese, in the province of Turin, Cairepro took care of the design and DL with the Innova Consortium, promoter of the operation, with the aim of valorising separate waste collection and the sustainability of different plastic materials.

The project involved the demolition of the original plant and the construction of one for the treatment of plastics, optimising the spaces and inserting new equipment for the disposal and valorisation processes of plastic materials.

Cairepro was responsible for the general construction, structural, plant and infrastructure design, taking care of the general fire-fighting project in particular

The new layout included the construction of two reinforced concrete sheds: the 1st for the reception and storage of materials, the 2nd for their treatment. In addition, a steel shed with wooden roofing was built to house the pressing stage and two sheds for the storage of plastic bales.

cairepro

Write a Reply or Comment