Dal Cero High School

Scuola Superiore Dal Cero
Scuola Superiore Dal Cero
Scuola Superiore Dal Cero

Expansion and new educational layout

The project concerns the construction of a new school building integrated with the existing facility, designed to accommodate approximately 300 students.

The architectural, structural and building systems design defines a three-level building, with classrooms and laboratories organised around a central internal square.
The ground floor includes the entrance, staff station, two classrooms and two laboratories connected to the existing building. The upper floors contain ten classrooms, arranged according to a clear and functional layout.

Energy efficiency, safety and accessibility

The building was designed to NZEB standards, with high-efficiency systems and rooftop photovoltaic panels.

Particular attention was given to safety, fire prevention and accessibility. The integration of a lift, dedicated ramps and a tactile pathway from the pedestrian entrance removes architectural barriers and supports inclusive use of the spaces.

Press review:
L’Arena

Categories Education
City San Bonifacio (VR)
Nation Italy
Status Ongoing
Year 2024
Client Province of Verona
Project Partners Geologist Roberto Farioli, Engineer Emanuele Morlini, Architect Anna Maria Portoghese

Key Points

  • Architectural, structural and building systems design for the expansion of the high school, integrated with the existing building.
  • New layout organised around a central internal square, with classrooms and laboratories distributed over three levels for approximately 300 students.
  • NZEB building with high-efficiency systems, photovoltaic integration, fire safety design and full accessibility solutions.

Expertise

Project team

Letizia Gilardi Ardilio Magotti Mauro Nasi Salvatore Sestito Luca Zanni Gabriele Zambelli Ivo Bertolini Alessandra Bruno Andrea Colombo Marco Oliverio Carlotta Pivetti Martina Spiezia Inna Tychyna
Categories Education
City San Bonifacio (VR)
Nation Italy
Status Ongoing
Year 2024
Client Province of Verona
Project Partners Geologist Roberto Farioli, Engineer Emanuele Morlini, Architect Anna Maria Portoghese

Expansion and new educational layout

The project concerns the construction of a new school building integrated with the existing facility, designed to accommodate approximately 300 students.

The architectural, structural and building systems design defines a three-level building, with classrooms and laboratories organised around a central internal square.
The ground floor includes the entrance, staff station, two classrooms and two laboratories connected to the existing building. The upper floors contain ten classrooms, arranged according to a clear and functional layout.

Energy efficiency, safety and accessibility

The building was designed to NZEB standards, with high-efficiency systems and rooftop photovoltaic panels.

Particular attention was given to safety, fire prevention and accessibility. The integration of a lift, dedicated ramps and a tactile pathway from the pedestrian entrance removes architectural barriers and supports inclusive use of the spaces.

Press review:
L’Arena

Key Points

  • Architectural, structural and building systems design for the expansion of the high school, integrated with the existing building.
  • New layout organised around a central internal square, with classrooms and laboratories distributed over three levels for approximately 300 students.
  • NZEB building with high-efficiency systems, photovoltaic integration, fire safety design and full accessibility solutions.

Expertise

Project team

Letizia Gilardi Ardilio Magotti Mauro Nasi Salvatore Sestito Luca Zanni Gabriele Zambelli Ivo Bertolini Alessandra Bruno Andrea Colombo Marco Oliverio Carlotta Pivetti Martina Spiezia Inna Tychyna